Work Packages



  • WP 1: Project Management

    The objectives of the WP Project ... more ...



  • WP 2: Requirements

    The objectives cover the description of the industrial carriers (involved processes, background, datasheets), needs and constraints. Furthermore,  demonstrators that comprise the critical aspects ... more ...



  • WP 3: In-depth process understanding

     

    A thorough understanding of the processes is indispensable to apply adaptive process control successfully. In fast changing consumer markets with challenging time-to-market ... more ...



  • WP 4: Model based knowledge systems

    The goal of WP4 is to develop fast models suitable for real-time production control that can be implemented in the process controller in WP6. The control system will be based on both virtually ... more ...



  • WP 5: In-line measurement

    The objectives of this work package cover the development of selected in-line sensor-suites for ‘real-time’ production-line control, augmented by overall quality verification on every N-th ... more ...



  • WP 6: Real-time process control

    The objective of WP6 is to develop and implement real-time process control systems applicable to the two demonstrator production lines. The following tasks are ... more ...



  • WP 7: Integration & demonstration

    In WP7 a demonstration line is built for both the additive manufacturing and the micro forming. The components developed in the different workpackages will be integrated. The line will be used for ... more ...



  • WP 8: Knowledge management

    The main objective of this Work Package is the dissemination, exploitation and standardisation of the project results. With respect to the high impact of the project it is important to spread the ... more ...



MEGaFiT is co-funded by the European Commission under grant agreement n° 285030

Copyright © 2017 www.megafit-project.eu. All Rights Reserved.

For more information please contact info@megafit-project.eu